What makes a Thetford scheme work is rarely the panels. It is the condition of the roof underneath them. Each survey records the cladding profile, the usable area once rooflights and plant are removed, and the export limit worth applying for.

897 kWh per kWp a year at this latitude, so a 500 kWp array models at about 449,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Thetford
96 m phase 1
Drawing Thetford unit
Roof 96 x 62 m
Array 500 kWp
Yield 449,000 kWh/yr
Scale 1:500 / Rev A / IP24

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Thetford / Norfolk
Distribution estate in the east of England with solar arrays on several roofs
Industrial stock of the kind we survey across East of England.

Logistics solar PV across Norfolk

What a roof in Thetford actually generates

Modelled irradiation at this latitude is 1150 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 897 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the towns we cover, so the case rests on your consumption pattern rather than on the weather.

Distribution stock around Thetford clusters on A11 and A134, which is where the large single-let roofs are.

Surveys run across IP postcodes, IP24 outward.

Breckland is the planning authority for most sites here, and the built-up area holds a population of about 25,510, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).

FIG. 1 What a Thetford roof makes, month by month

What a Thetford roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 24 kWh per kWpJanFeb: 38 kWh per kWpFebMar: 72 kWh per kWpMarApr: 105 kWh per kWpAprMay: 121 kWh per kWpMayJun: 123 kWh per kWpJun123 kWh Jul: 123 kWh per kWpJulAug: 107 kWh per kWpAugSep: 83 kWh per kWpSepOct: 52 kWh per kWpOctNov: 30 kWh per kWpNovDec: 21 kWh per kWpDec

Jun produces 5.9 times what Dec does on the same roof. A 500 kWp array here models at about 449,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2412,000
Feb3819,000
Mar7236,000
Apr10552,500
May12160,500
Jun12361,500
Jul12361,500
Aug10753,500
Sep8341,500
Oct5226,000
Nov3015,000
Dec2110,500
Source: EU PVGIS v5.2
FIG. 2 Thetford against the rest of Norfolk
  • Cromer923
  • Great Yarmouth920
  • Wymondham906
  • Attleborough906
  • Norwich904
  • Dereham898
  • King's Lynn897
  • Thetford897

Thetford ranks 8 of 8 towns we cover in Norfolk on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 897 to 923, a spread of 26 kWh per kWp. Within Norfolk that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near IP24

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Raf Honington Solar Farm Euston Solar Farm Ltd Island Green Power n/a Ground Under Construction
Woodlands Farm - Solar Array Elgin Energy EsCo Limited 49.9 MW Ground Awaiting Construction
Thetford International, Bury Road, - Solar PV Systems Thetford International Limited 0.25 MW Roof Awaiting Construction
The Bishops CE Primary Academy - Solar Panels Solar Options for Schools Limited 0.21 MW Roof Awaiting Construction
Around Eriswell, Eriswell - Solar Array Elveden Farms Limited 0.35 MW Ground Application Submitted
Thetford Sports Centre, Croxton Road - Solar Panels Breckland District Council 0.2 MW Roof Awaiting Construction

Grid connection through UK Power Networks

UK Power Networks operates the distribution network across Norfolk, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Across Norfolk the planning database records 179 solar schemes totalling 1490 MW, of which 43 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Thetford

What would a 500 kWp array produce in Thetford?
Yes, and the number matters more than the sunshine. At 897 kWh per kWp a year, a 500 kWp array on a Thetford roof models at around 449,000 kWh. What changes the answer is how much of that you use on site rather than export. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Which network operator handles the connection in Thetford?
Applications go to UK Power Networks, who run the network across Norfolk. They decide the export limit, and we handle the G99 paperwork alongside the array design.
What does Breckland require for rooftop solar?
Roof-mounted panels on a commercial building usually fall under permitted development, subject to the limits on projection above the roof plane and to the building not being listed or in a conservation area. We confirm the position with Breckland before the design is finalised.
Has anyone near IP24 already done this?
The planning database records 6 solar schemes in this postcode district, 3 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.