warehousesolarpanels Commercial rooftop PV, UK wide Book a roof survey

Solar panels for warehouses in Market Harborough

The economics of a Market Harborough rooftop array turn on how much of the generation the occupier uses on site. The survey measures the roof, not the postcode: cladding profile, purlin centres, remaining sheet life and the load the frame can take.

891 kWh per kWp a year at this latitude, so a 500 kWp array models at about 446,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Market Harborough
96 m phase 1
Drawing Market Harborough unit
Roof 96 x 62 m
Array 500 kWp
Yield 446,000 kWh/yr
Scale 1:500 / Rev A / LE16

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Market Harborough / Leicestershire
Midlands logistics park beside a motorway junction, several roofs carrying arrays
Industrial stock of the kind we survey across East Midlands.

Warehouse rooftop solar across Leicestershire

What a roof in Market Harborough actually generates

Modelled irradiation at this latitude is 1136 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 891 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the towns we cover, so the case rests on your consumption pattern rather than on the weather.

Distribution stock around Market Harborough clusters on A6, A4304 and A14, which is where the large single-let roofs are.

Most of the units we look at here sit in the LE postcode area.

Harborough is the planning authority for most sites here, and the built-up area holds a population of about 24,165, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).

FIG. 1 What a Market Harborough roof makes, month by month

What a Market Harborough roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 23 kWh per kWpJanFeb: 37 kWh per kWpFebMar: 73 kWh per kWpMarApr: 103 kWh per kWpAprMay: 120 kWh per kWpMayJun: 122 kWh per kWpJunJul: 124 kWh per kWpJul124 kWh Aug: 106 kWh per kWpAugSep: 82 kWh per kWpSepOct: 50 kWh per kWpOctNov: 29 kWh per kWpNovDec: 21 kWh per kWpDec

Jul produces 5.9 times what Dec does on the same roof. A 500 kWp array here models at about 446,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2311,500
Feb3718,500
Mar7336,500
Apr10351,500
May12060,000
Jun12261,000
Jul12462,000
Aug10653,000
Sep8241,000
Oct5025,000
Nov2914,500
Dec2110,500
Source: EU PVGIS v5.2
FIG. 2 Market Harborough against the rest of Leicestershire
  • Market Harborough891
  • Melton Mowbray879
  • Wigston877
  • Leicester874
  • Hinckley870
  • Loughborough868
  • Coalville863

Market Harborough ranks 1 of 7 towns we cover in Leicestershire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 863 to 891, a spread of 28 kWh per kWp. Within Leicestershire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near LE16

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Eckland Lodge Farm Stuart Howes & Son Ltd 2.9 MW Ground Operational
RAF Desborough RAF Desb 49.9 MW Ground Planning Permission Expired
Land at Meadow Farm Lightsource Renewable Energy 5 MW Ground Operational
The Robert Smyth School, Burnmill Road - Solar Panels Robert Smyth Academy 0.17 MW Roof Revised
The Robert Smyth School, Burnmill Road - Solar Panels Robert Smyth Academy 0.17 MW Roof Awaiting Construction
Astley Grange Farm, Back Lane - Solar Panels Unknown 0.28 MW Roof Awaiting Construction

Grid connection through National Grid Electricity Distribution

National Grid Electricity Distribution operates the distribution network across Leicestershire, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Across Leicestershire the planning database records 165 solar schemes totalling 1259 MW, of which 37 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Market Harborough

What would a 500 kWp array produce in Market Harborough?
Yes, and the number matters more than the sunshine. At 891 kWh per kWp a year, a 500 kWp array on a Market Harborough roof models at around 446,000 kWh. What changes the answer is how much of that you use on site rather than export. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Which network operator handles the connection in Market Harborough?
Applications go to National Grid Electricity Distribution, who run the network across Leicestershire. They decide the export limit, and we handle the G99 paperwork alongside the array design.
What does Harborough require for rooftop solar?
Roof-mounted panels on a commercial building usually fall under permitted development, subject to the limits on projection above the roof plane and to the building not being listed or in a conservation area. We confirm the position with Harborough before the design is finalised.
Has anyone near LE16 already done this?
The planning database records 6 solar schemes in this postcode district, 3 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All Leicestershire locations