Solar panels for warehouses in Southwark
The economics of a Southwark rooftop array turn on how much of the generation the occupier uses on site. Each survey records the cladding profile, the usable area once rooflights and plant are removed, and the export limit worth applying for.
903 kWh per kWp a year at this latitude, so a 500 kWp array models at about 452,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in SouthwarkIllustrative layout for a unit of this size. Your own figures come from the roof survey.
Warehouse rooftop solar across Greater London
What a roof in Southwark actually generates
Modelled irradiation at this latitude is 1163 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 903 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the towns we cover, so the case rests on your consumption pattern rather than on the weather.
Southwark ranks 32 of 50 towns we cover in Greater London on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 847 to 987, a spread of 140 kWh per kWp. On a 500 kWp array that is about 70,000 kWh a year between the strongest and weakest town in the county.
Grid connection through UK Power Networks
UK Power Networks is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.
Send us the postcode
Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.
Questions about solar in Southwark
- How much does a warehouse roof in Southwark generate?
- The model gives 903 kWh for every kWp installed here, so 500 kWp comes out at about 452,000 kWh a year before any shading losses. You need roughly 1,485 sqm of clear roof to fit it. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- Does the grid around Southwark have capacity?
- UK Power Networks is the distribution network operator for Greater London. Anything above 3.68 kW per phase connects under G99, and the application sets the export limit. We submit it as part of the design.