warehousesolarpanels Commercial rooftop PV, UK wide Book a roof survey

Solar panels for warehouses in Ealing

The economics of a Ealing rooftop array turn on how much of the generation the occupier uses on site. Each survey records the cladding profile, the usable area once rooflights and plant are removed, and the export limit worth applying for.

905 kWh per kWp a year at this latitude, so a 500 kWp array models at about 453,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Ealing
96 m phase 1
Drawing Ealing unit
Roof 96 x 62 m
Array 500 kWp
Yield 453,000 kWh/yr
Scale 1:500 / Rev A / Greater London

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Ealing / Greater London
Aerial view of an industrial estate where some warehouse roofs carry solar arrays and others are bare steel
Industrial stock of the kind we survey across Greater London.

Warehouse rooftop solar across Greater London

What a roof in Ealing actually generates

Modelled irradiation at this latitude is 1163 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 905 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the towns we cover, so the case rests on your consumption pattern rather than on the weather.

FIG. 1 What a Ealing roof makes, month by month

What a Ealing roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 26 kWh per kWpJanFeb: 39 kWh per kWpFebMar: 73 kWh per kWpMarApr: 105 kWh per kWpAprMay: 120 kWh per kWpMayJun: 124 kWh per kWpJunJul: 125 kWh per kWpJul125 kWh Aug: 105 kWh per kWpAugSep: 83 kWh per kWpSepOct: 52 kWh per kWpOctNov: 31 kWh per kWpNovDec: 22 kWh per kWpDec

Jul produces 5.7 times what Dec does on the same roof. A 500 kWp array here models at about 453,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2613,000
Feb3919,500
Mar7336,500
Apr10552,500
May12060,000
Jun12462,000
Jul12562,500
Aug10552,500
Sep8341,500
Oct5226,000
Nov3115,500
Dec2211,000
Source: EU PVGIS v5.2
FIG. 2 Ealing against the rest of Greater London
  • Brixton906
  • Clapham906
  • Notting Hill906
  • Vauxhall906
  • Ealing905
  • Hillingdon904
  • Lewisham904
  • Stratford904
  • Wimbledon904

Ealing ranks 21 of 50 towns we cover in Greater London on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 847 to 987, a spread of 140 kWh per kWp. On a 500 kWp array that is about 70,000 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through UK Power Networks

UK Power Networks operates the distribution network across Greater London, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Ealing

What would a 500 kWp array produce in Ealing?
Yes, and the number matters more than the sunshine. At 905 kWh per kWp a year, a 500 kWp array on a Ealing roof models at around 453,000 kWh. What changes the answer is how much of that you use on site rather than export. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Which network operator handles the connection in Ealing?
Applications go to UK Power Networks, who run the network across Greater London. They decide the export limit, and we handle the G99 paperwork alongside the array design.

Nearby

All Greater London locations