Solar panels for warehouses in Goole

What makes a Goole scheme work is rarely the panels. It is the condition of the roof underneath them. Each survey records the cladding profile, the usable area once rooflights and plant are removed, and the export limit worth applying for.

858 kWh per kWp a year at this latitude, so a 500 kWp array models at about 429,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Goole
96 m phase 1
Drawing Goole unit
Roof 96 x 62 m
Array 500 kWp
Yield 429,000 kWh/yr
Scale 1:500 / Rev A / DN14

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Goole / East Riding of Yorkshire
West Yorkshire industrial park below moorland, with solar on several roofs
Industrial stock of the kind we survey across Yorkshire and The Humber.

Logistics solar PV across East Riding of Yorkshire

What a roof in Goole actually generates

Modelled irradiation at this latitude is 1098 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 858 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 3 percent below the mean across the towns we cover, so the case here leans harder on how much you use on site rather than on raw generation.

Distribution stock around Goole clusters on M62 J36, M18 J5 and A614, which is where the large single-let roofs are.

Surveys run across DN postcodes, DN14 outward.

East Riding of Yorkshire is the planning authority for most sites here, and the built-up area holds a population of about 20,175, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).

FIG. 1 What a Goole roof makes, month by month

What a Goole roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 21 kWh per kWpJanFeb: 36 kWh per kWpFebMar: 70 kWh per kWpMarApr: 100 kWh per kWpAprMay: 122 kWh per kWpMay122 kWh Jun: 116 kWh per kWpJunJul: 120 kWh per kWpJulAug: 104 kWh per kWpAugSep: 78 kWh per kWpSepOct: 47 kWh per kWpOctNov: 26 kWh per kWpNovDec: 18 kWh per kWpDec

May produces 6.8 times what Dec does on the same roof. A 500 kWp array here models at about 429,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2110,500
Feb3618,000
Mar7035,000
Apr10050,000
May12261,000
Jun11658,000
Jul12060,000
Aug10452,000
Sep7839,000
Oct4723,500
Nov2613,000
Dec189,000
Source: EU PVGIS v5.2
FIG. 2 Goole against the rest of East Riding of Yorkshire
  • Driffield870
  • Hessle868
  • Hull867
  • Beverley864
  • Bridlington859
  • Goole858

Goole ranks 6 of 6 towns we cover in East Riding of Yorkshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 858 to 870, a spread of 12 kWh per kWp. Within East Riding of Yorkshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Solar already consented near DN14

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Pollington Solar Farm Pollington Solar 5 MW Ground Operational
Land at Pollington Airfield Lightsource Renewable Energy 5 MW Ground Operational
Sudforth Lane (Kellingley Solar Farm) First Renewable Developments/ Harworth Group 5 MW Ground Operational
East Yorkshire Solar Farm Boom Power 400 MW Ground Awaiting Construction
Thomas Armstrong - Solar Panels Thomas Armstrong (Construction) Limited 0.18 MW Roof Awaiting Construction
Commons Farm, Thorne Road - Solar Panels C S Backhouse 0.36 MW Ground Awaiting Construction

Grid connection through Northern Powergrid

Northern Powergrid is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across East Riding of Yorkshire the planning database records 86 solar schemes totalling 1439 MW, of which 2 are operational (REPD Q1 2026).

Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Goole

What would a 500 kWp array produce in Goole?
Yes, and the number matters more than the sunshine. At 858 kWh per kWp a year, a 500 kWp array on a Goole roof models at around 429,000 kWh. What changes the answer is how much of that you use on site rather than export. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Which network operator handles the connection in Goole?
Applications go to Northern Powergrid, who run the network across East Riding of Yorkshire. They decide the export limit, and we handle the G99 paperwork alongside the array design.
What does East Riding of Yorkshire require for rooftop solar?
Roof-mounted panels on a commercial building usually fall under permitted development, subject to the limits on projection above the roof plane and to the building not being listed or in a conservation area. We confirm the position with East Riding of Yorkshire before the design is finalised.
Has anyone near DN14 already done this?
The planning database records 6 solar schemes in this postcode district, 1 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.