warehousesolarpanels Commercial rooftop PV, UK wide Book a roof survey

Solar panels for warehouses in Dorchester

Sheds around Dorchester tend to have more roof than the business has any other use for. What decides a scheme here is the state of the covering and the load path, which is why the survey starts on the roof rather than in a spreadsheet.

985 kWh per kWp a year at this latitude, so a 500 kWp array models at about 493,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Dorchester
96 m phase 1
Drawing Dorchester unit
Roof 96 x 62 m
Array 500 kWp
Yield 493,000 kWh/yr
Scale 1:500 / Rev A / DT1

Illustrative layout for a unit of this size. Your own figures come from the roof survey.

Dorchester / Dorset
South West industrial estate on the edge of a market town, with rooftop solar
Industrial stock of the kind we survey across South West.

Distribution centre solar across Dorset

What a roof in Dorchester actually generates

Modelled irradiation at this latitude is 1258 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 985 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is around 11 percent above the mean across the towns we cover, which is as good as UK rooftop gets outside the south coast.

We survey across the DT postcode area, starting from DT1.

Dorset is the planning authority for most sites here, and the built-up area holds a population of about 21,360, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).

FIG. 1 What a Dorchester roof makes, month by month

What a Dorchester roof makes, month by month

Modelled output per kWp installed, for a shallow-pitched south-facing array. Source: EU PVGIS v5.2.

050100Jan: 27 kWh per kWpJanFeb: 43 kWh per kWpFebMar: 80 kWh per kWpMarApr: 115 kWh per kWpAprMay: 133 kWh per kWpMayJun: 135 kWh per kWpJunJul: 136 kWh per kWpJul136 kWh Aug: 115 kWh per kWpAugSep: 88 kWh per kWpSepOct: 53 kWh per kWpOctNov: 33 kWh per kWpNovDec: 23 kWh per kWpDec

Jul produces 5.9 times what Dec does on the same roof. A 500 kWp array here models at about 493,000 kWh across the year, but it arrives unevenly, which is why we size against your summer daytime load and then look at whether storage is worth adding for the shoulder months.

Monthly figures as a table
MonthkWh per kWp500 kWp array
Jan2713,500
Feb4321,500
Mar8040,000
Apr11557,500
May13366,500
Jun13567,500
Jul13668,000
Aug11557,500
Sep8844,000
Oct5326,500
Nov3316,500
Dec2311,500
Source: EU PVGIS v5.2
FIG. 2 Dorchester against the rest of Dorset
  • Weymouth1006
  • Dorchester985
  • Christchurch981
  • Bournemouth971
  • Bridport971
  • Poole965
  • Wimborne964
  • Sherborne924

Dorchester ranks 2 of 8 towns we cover in Dorset on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 924 to 1006, a spread of 82 kWh per kWp. On a 500 kWp array that is about 41,000 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: location is not the lever, consumption is. Source: EU PVGIS v5.2, modelled per town

Grid connection through Scottish and Southern Electricity Networks

Scottish and Southern Electricity Networks is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across Dorset the planning database records 149 solar schemes totalling 1078 MW, of which 47 are operational (REPD Q1 2026).

Solar already consented near DT1

From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.

Scheme Operator Capacity Mounting Status
Dorchesters Corn Exchange - Solar Panels & Biomass Boiler Dorchester Town Council n/a Roof Under Construction
High East - Solar Panels 21st Century Homes 0.26 MW Roof Awaiting Construction
Prince Of Wales Road - Solar Photovoltaic Equipment Solar South West Limited 0.2 MW Roof Awaiting Construction
Damers First School - Solar Panels Solar Options for Schools Limited 0.19 MW Roof Awaiting Construction
Thomas Hardye School - Solar Panels Solar Options for Schools Limited 0.59 MW Roof Awaiting Construction
Book the survey

Send us the postcode

Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions about solar in Dorchester

Is there enough sun in Dorchester to make this work?
Modelled at 985 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 493,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once walkways and setbacks are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Who do we apply to for export in Dorchester?
Capacity varies street by street, and only Scottish and Southern Electricity Networks can answer it for your connection. We ask the question early, because an export-limited offer changes the design rather than killing the scheme.
Do we need planning permission in Dorset?
In most cases no, because roof-mounted panels on commercial buildings sit within permitted development. The exceptions are listed buildings, conservation areas and arrays that stand proud of the roof plane. We check with Dorset first either way.
Has anyone near DT1 already done this?
The planning database records 5 solar schemes in this postcode district, 5 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.

Nearby

All Dorset locations