Solar panels for warehouses in Marlow
Most of the industrial stock around Marlow carries a large, shallow-pitched roof that was never asked to do anything. Each survey records the cladding profile, the usable area once rooflights and plant are removed, and the export limit worth applying for.
904 kWh per kWp a year at this latitude, so a 500 kWp array models at about 452,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in MarlowIllustrative layout for a unit of this size. Your own figures come from the roof survey.
Distribution centre solar across Buckinghamshire
What a roof in Marlow actually generates
Modelled irradiation at this latitude is 1161 kWh per square metre a year in the plane of a shallow-pitched roof, which works out at 904 kWh for every kWp installed (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That sits within a few percent of the mean across the towns we cover, so the case rests on your consumption pattern rather than on the weather.
We survey across the SL postcode area, starting from SL7.
Windsor and Maidenhead is the planning authority for most sites here, and the built-up area holds a population of about 14,645, so the stock here runs to trade counters, light industrial terraces and the occasional larger shed (ONS Census 2021 built-up areas).
Marlow ranks 1 of 8 towns we cover in Buckinghamshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 881 to 904, a spread of 23 kWh per kWp. Within Buckinghamshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.
Solar already consented near SL7
From the government's Renewable Energy Planning Database, Q1 2026. These are the schemes on record in this postcode district, which is a fair guide to how the local network has been treating export applications.
| Scheme | Operator | Capacity | Mounting | Status |
|---|---|---|---|---|
| Land North of Marlow Landfill Site | Anesco | 5 MW | Ground | Application Refused |
| Globe Business Park, Fieldhouse Lane - PV Panels | Columbia Threadneedle Investments Limited | n/a | Roof | Awaiting Construction |
Grid connection through Scottish and Southern Electricity Networks
Connections around Marlow are handled by Scottish and Southern Electricity Networks, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a warehouse uses most of what the roof makes during the working day.
Across Buckinghamshire the planning database records 127 solar schemes totalling 955 MW, of which 21 are operational (REPD Q1 2026).
Send us the postcode
Tell us where the unit is and roughly how big the roof is. We come back with what it can carry, what it would generate against your consumption, and the three ways to pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to our MCS-certified installation partner so they can quote.
Questions about solar in Marlow
- Is there enough sun in Marlow to make this work?
- Modelled at 904 kWh per kWp a year for a shallow-pitched roof at this latitude, which puts a 500 kWp array at roughly 452,000 kWh a year before shading. That array needs about 1,485 sqm of clear roof once walkways and setbacks are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- Who do we apply to for export in Marlow?
- Capacity varies street by street, and only Scottish and Southern Electricity Networks can answer it for your connection. We ask the question early, because an export-limited offer changes the design rather than killing the scheme.
- Do we need planning permission in Windsor and Maidenhead?
- In most cases no, because roof-mounted panels on commercial buildings sit within permitted development. The exceptions are listed buildings, conservation areas and arrays that stand proud of the roof plane. We check with Windsor and Maidenhead first either way.
- Has anyone near SL7 already done this?
- The planning database records 2 solar schemes in this postcode district, 1 of them roof mounted. That matters less as proof that it works and more as evidence of how the local network has been treating export applications. Source: Renewable Energy Planning Database, Q1 2026.